MEMS Power Generation Headquarters
Zumtobel Group Brands Deliver Energy Efficient Lighting Package for MEMS Power Generation's New Headquarters
The Lighting Project
Zumtobel and Thorn were tasked with designing a lighting solution that aligns with MEMS' ambitious green agenda while addressing the unique challenges of a 24-hour operational site. Working closely with electrical contractor Gilbert and Stamper, and main contractor WW Martin, Zumtobel and Thorn provided a comprehensive, energy-efficient lighting scheme throughout the facility, including circulation areas, office spaces, plant rooms, and external surroundings. Zumtobel's advanced LITECOM lighting control system played a key role in helping MEMS meet stringent planning conditions. The system is programmed to ensure that lights in key areas, such as the main office and circulation spaces, automatically switch off during non-working hours. Additionally, LITECOM is configured to create a notional corridor of light in the main office, ensuring that after-hours, when the lights are activated, they form a well-lit path to the stairs and corridor downstairs, which was a specific planning requirement. In the storage areas, the LITECOM system connects to Zumtobel's TECTON luminaires, providing on/off control or absence detection. This means lights only turn on when needed, significantly reducing energy consumption. The system allows MEMS full control over lighting schedules, enhancing both operational efficiency and energy savings, while maintaining optimal working conditions for staff.






